Brief
Wavin, with The Hague UAS and the BUCH municipalities
Scope
Research, structure, CAD, FEA, tooling and drawings
Material
Recycled PE100, injection moulded, plus standard d160 pipe
Module
600 × 600 mm grid, 500 mm tall
of the volume holds water
stored per m² of street
of plastic per 600 mm bay
of storage per truckload
Collect
Gullies feed an edge panel with a d160 socket. One inlet takes 9 litres a second.
Store
93% of the field is water. Every square metre of street holds 466 litres in 500 mm of depth.
Release
On sand a full field drains in about a day. On clay a throttled outlet empties it into the sewer after the peak.

AI-generated image of a BUCH-type street in a summer cloudburst.
The brief asks for 110 mm in an hour, about twice the local 100-year hour. StormRider 2 is sized so a strip a little over two metres wide stores 100 mm of rain from a 10 m wide street.
Sources: KNMI, Waternet (Feb 2024), the BUCH water programme 2023 to 2026, and the Wavin Core and Q-Bic Plus datasheets.
System
Unit, mm
Void
Stated strength
Inspection
Nests
Wavin Q-Bic Plus
1200 × 600 × 600
95 to 96%
no kN/m² given
yes, 370 mm channel
not stated
Wavin AquaCell Eco
1000 × 500 × 400
95%
213 kN/m², no traffic
not stated
not stated
Wavin AquaCell Plus-R
1000 × 500 × 400
95%
70.2 t/m²
yes
not stated
Permavoid 85 and 150
708 × 354 × 85 or 150
92 to 95%
715 kN/m²
not stated
not stated
GRAF EcoBloc Inspect flex
800 × 800 × 320
95%
60 t vehicles, 800 mm cover
yes
yes
ACO StormBrixx
1200 × 600 × 914 or 610
95 to 97%
350 to 455 kN/m²
yes
yes
Atlantis Flo-Tank
685 × 408 × 450
95%
28 t/m²
not stated
not stated
REHAU RAUSIKKO Box 8.6
800 × 800 × 660
95%
420 to 800 kN/m²
SC and HC versions
yes
FRÄNKISCHE Rigofill inspect
800 × 800 × 660
95%
road class Bk3,2
yes
not stated
Polypipe Polystorm-R
1000 × 500 × 400
95%
610 kN/m²
with an access unit
not stated
StormRider 2
600 × 600 × 500
93%
not yet: yield at the leg edges under 218 kPa in the 3D model
yes, galleries
yes
Sources: the makers’ datasheets and tender texts, collected in November 2026. “Not stated” means the document does not say.
Supports up to 70 t/m²
Not yet. Under the 218 kPa design load the 3D model reaches 32 MPa at the free edge of the legs, above the 25 MPa yield; the 687 kPa rating is out of reach in PE100 at this mass
3D FEA; full-scale load test
Handles rainfall of up to 110 mm/hour
466 litres per m² of footprint. A 2.1 m wide strip stores 100 mm from a 10 m wide street
Volume measured on the CAD model
Infiltration: water enters at 9 L/s
One d160 inlet takes 9 L/s at 0.53 m/s
Hand calculation
Max height of 50 cm per block
500 mm, with its base 0.63 m below the street
CAD
Adapted to the local groundwater level
The whole build-up ends 0.70 m down, at the BUCH high-groundwater line. On clay it stores and drains through a throttled outlet
Levels from the municipal street standard
Components remain fixed during use
Caps pin four deck corners with dowels; edge panels close the field, with a hook added in the review
CAD and drawings
Resists internal and external forces
A worker on the bare shell (12 MPa) and the pavement over 50 years (0.4 MPa) pass; traffic does not yet, and the legs need revision B
3D FEA
Prevents volume increase over time
The pavement alone deflects the shell 1 mm over 50 years with the creep modulus
3D FEA; creep test
Ensures effective road water runoff
Gullies feed the inlet panels; the fine comb and the geotextile keep sand out
Detail design

Turtle shell, the carapace
A dome carries load in compression. The shell follows a parabola, the shape a uniform load asks for, so a 5 mm skin with the scute lines turned into ribs underneath is enough to span 600 mm.

Pyramided tortoise, the hollow posts
Some tortoises grow each scute as a small pyramid. Hollow posts on the scute centres carry the deck and open underneath, so one shell drops into the next and they nest at 62 mm.

Elephant foot, the foot pad
A wide ribbed pad spreads half a wheel, about 37 kN, to roughly 150 kPa on the ground. Holes between the ribs let the water through to the soil.

Honeycomb, the deck
Two cell sizes in one 40 mm plate. The 80 mm cells carry the wheel load to the posts, and a 27 mm comb in the top 10 mm holds the bedding grit.

Ant nest, the galleries
An ant nest is as much tunnel as wall. The space under the shells forms arched galleries in both directions, for water and for a camera crawler.

Together, one kit
The five animals add up to six parts: carapace, deck, foot, column, cap and edge panel.
AI-generated sketches.

Vault
One moulded groin vault with its own columns. Strong, but it only nests at 318 mm, so trucks would carry mostly air.

Capital
Pipe columns with mushroom capitals under a thin dome. The pipes worked; the capitals became the heaviest part and did not nest.

Carapace
The dome flows down into funnel legs around the columns, and the capitals disappear. The deep honeycomb deck above it cannot nest.

Pyramided carapace
Hollow posts move the deck’s depth into the shell. The posts nest, and the deck becomes a flat 40 mm plate.
Measured on the model
Vault
Capital
Carapace
Pyramided carapace
Mass per bay
18.7 kg
21.6 kg
13.1 kg
11.7 kg
Share of the volume that holds water
89.2%
87.4%
92.5%
93.3%
Worst part for nesting
vault, 318 mm
capital, 306 mm
deck, 170 mm
shell, 62 mm
Storage per truckload
78 m³
110 m³
115 m³
206 m³
A trailer is full long before it is heavy. With the deep deck, iteration C fills a trailer with 115 m³ of storage. Once the posts nest, the shells stack at 62 mm and the same trailer carries 206 m³. That is the reason for the hollow posts: they move the deck’s depth into a part that already nests.


Part
One per
Mass
Made by
Ships
Carapace
bay
4.38 kg
injection moulded
nests at 62 mm
Deck
bay
3.10 kg
injection moulded
stacks at 40 mm
Foot
grid point
1.00 kg
injection moulded
nests at 46 mm
Column
grid point
2.84 kg
cut from d160 SDR11 pipe
bundled
Cap
grid point
0.34 kg
injection moulded
nests at 50 mm
Edge panel
field edge
0.60 kg
injection moulded
stacks at 26 mm
A bay stores 168 litres for 11.7 kg of plastic, about 70 kg per m³ of water.

A paraboloid shell, z = 446 - 0.0015 r², with a 5 mm skin at the crown and 6 mm at the edge. Ribs 4 mm thick and 32 mm deep follow the scute lines underneath, and 23 hollow hexagonal posts with 6° of draft rise from the scute centres to carry the deck.


Same span, rise, wall and load in a 2D section. The semicircle bends past yield; the parabola stays in compression at 13 MPa, within 4% of the hand calculation. That set the shell’s shape, z = 446 - 0.0015 r². A 2D section cannot show what happens at the open legs, which is what the 3D model is for.




Legs and outer shell at 10 mm instead of 6, lips 56 mm deep instead of 36. The peak drops to 26 MPa, at the yield, and moves to a post base, where a moulded fillet will lower it further. It costs 1.3 kg per shell.
At yield is not a design. The next step is to close the free edges of the legs with a return flange, so they stop acting as cantilevers.
A plate model of the honeycomb deck shows 40 MPa in the walls next to the posts, where the hand calculation found 7.9 MPa, because the deck overhangs the last posts. Carried cap to cap along its two free edges it drops to 11 MPa.
Mesh check: from 8 to 6 mm elements the 99.5th percentile stress changes 0.1% and the displacement 0.6%; only the sharp, unfilleted post-to-shell corners keep rising, as corners do. Linear elastic, perfect geometry, legs pinned on the foot pads; these results rank risks and size parts, they replace no test.



Part
Projected area
Clamp force
Thickest wall
Cooling, nominal and thickest
Tool
Carapace
0.34 m²
1,030 t
6.9 mm
36 s, 48 s
two-plate, one cavity, valve gates
Deck
0.17 m²
521 t
10.2 mm
20 s, 105 s
two-plate, one cavity, no slides
Foot
0.12 m²
361 t
8.7 mm
36 s, 76 s
two-plate, two cavities
Cap
0.04 m²
118 t
14.8 mm
36 s, 221 s
two-plate, four cavities
Edge panel
0.09 m²
275 t
6.8 mm
36 s, 47 s
two-plate, two cavities
Column
none
none
14.6 mm pipe wall
none
cut, squared and deburred from d160 SDR11 pipe
Clamp force at a mean cavity pressure of 30 MPa (20 to 40 MPa gives the range). Cooling time from the plate formula for HDPE with a thermal diffusivity of 0.10 mm²/s, melt at 230 °C, mould at 30 °C and ejection at 90 °C. Walls measured on the model to about 0.5 mm.
Carapace legs sit 4.9 cm³ into the foot ribs, and the Ø172 leg hole meets a Ø174 socket
Open the hole to Ø180 and add a landing ring on the foot: about 2.4 MPa bearing per leg
The column stops 4 mm under the cap, so the cap carries nothing
Cut the column to 448 mm with square ends
Deck and carapace are both 600 mm on a 600 mm grid, so moulding tolerance has nowhere to go
Mould both to 595 ±1 mm, for a 4 to 6 mm joint
The edge panel has no stop on its inner face, and earth pressure pushes it inward
Add a hook that catches under the carapace lip
In the 23 landing cells the deck floor and the fine comb close the cell from both sides: 835 cm² no mould half can reach
Leave the fine comb out above the landing floors
20% of the carapace surface is drawn at 0°, and its ribs are 67 to 80% of the skin, so sink marks are likely
1° per side, ribs 3.5 mm at the root, then recheck buckling
Solid Ø16 cap dowels and solid boss tops on the deck: 221 s and 105 s to cool
Core them out to the wall thickness of the part
The strength values come from a PE100 pipe compound, an extrusion grade
Choose an injection-moulding HDPE grade and recheck strength and creep against its datasheet










AI-generated storyboard sketch.

Levelling bed and feet on a string line

Columns cut from pipe drop into the sockets

Shells slide over the columns and panels close the edges

Caps lock the decks

Geotextile, bedding and pavers go back on


Full-scale load on a 2 × 2 field of revision B
Where does it yield and buckle, and does the 3D model predict it?
Strains at the leg edges and post bases within 15% of the model; no buckling below 1.5 times the design load
1000-hour sustained load
Does it creep under the pavement?
Crown deflection settles below 2 mm
Mould trial of the carapace
Can the ribs under a 5 mm skin be moulded clean?
No sink marks; otherwise the ribs go to 3.5 mm at the root
Fatigue of recycled PE100
Recycled pipe HDPE fails sooner near yield
No cracks after a million axle cycles at service stress
Inflow and sediment
Does 9 L/s get in, and does sand stay out?
The inlet passes 9 L/s and the galleries stay clean for a season
Camera run
Can a crawler reach every bay?
Full coverage of a 6 × 4 field
Installation trial
How fast can two people build it?
Time per m² compared with a stone foundation
stored in 500 mm of depth
the water a stone foundation holds
less stone in the street
of storage per truckload

AI-generated image of the same street after reconstruction. The storage sits out of sight under the pavers.