StormRider 2

StormRider 2

A storm-water kit that replaces the stone foundation under Dutch residential streets. Thin recycled PE100 shells, shaped like a tortoise carapace, hold 466 litres of rain under every square metre of street and still fit above high groundwater.

A storm-water kit that replaces the stone foundation under Dutch residential streets. Thin recycled PE100 shells, shaped like a tortoise carapace, hold 466 litres of rain under every square metre of street and still fit above high groundwater.

Brief

Wavin, with The Hague UAS and the BUCH municipalities

Scope

Research, structure, CAD, FEA, tooling and drawings

Material

Recycled PE100, injection moulded, plus standard d160 pipe

Module

600 × 600 mm grid, 500 mm tall

93%

93%

of the volume holds water

466 L

466 L

stored per m² of street

11.7 kg

11.7 kg

of plastic per 600 mm bay

206 m³

206 m³

of storage per truckload

How it works

How it works

StormRider 2 takes the place of the stone foundation under the pavers. In a cloudburst the gullies lead the water into the field, it spreads through the arched galleries under the shells, and over the next day it soaks into the ground. Where the soil is clay, a throttled outlet lets it out slowly instead.

StormRider 2 takes the place of the stone foundation under the pavers. In a cloudburst the gullies lead the water into the field, it spreads through the arched galleries under the shells, and over the next day it soaks into the ground. Where the soil is clay, a throttled outlet lets it out slowly instead.

Collect

Gullies feed an edge panel with a d160 socket. One inlet takes 9 litres a second.

Store

93% of the field is water. Every square metre of street holds 466 litres in 500 mm of depth.

Release

On sand a full field drains in about a day. On clay a throttled outlet empties it into the sewer after the peak.

The problem sits in a half metre

The problem sits in a half metre

Dutch rain is getting heavier in short bursts. KNMI measures hourly extremes rising 10 to 15% for every degree of warming, and a local 1-in-100-year hour, about 58 mm, now happens somewhere in the country almost every year.

Dutch rain is getting heavier in short bursts. KNMI measures hourly extremes rising 10 to 15% for every degree of warming, and a local 1-in-100-year hour, about 58 mm, now happens somewhere in the country almost every year.

In the BUCH villages, groundwater counts as high when it comes within 0.70 m of the street. A crate needs at least 0.75 m of cover under traffic, so in those streets it would sit in the water. The usual answer there is a slotted pipe in the road’s stone foundation, where only 20 to 35% of the volume is air.

In the BUCH villages, groundwater counts as high when it comes within 0.70 m of the street. A crate needs at least 0.75 m of cover under traffic, so in those streets it would sit in the water. The usual answer there is a slotted pipe in the road’s stone foundation, where only 20 to 35% of the volume is air.

A brick residential street during a cloudburst, water ponding along the gutter

AI-generated image of a BUCH-type street in a summer cloudburst.

Three street sections to one depth scale: a crate, a stone foundation and StormRider 2, with high groundwater at 0.70 m
Three street sections to one depth scale: a crate, a stone foundation and StormRider 2, with high groundwater at 0.70 m
Bar chart of design storms in millimetres per hour
Bar chart of design storms in millimetres per hour

Design storms keep growing

Design storms keep growing

The brief asks for 110 mm in an hour, about twice the local 100-year hour. StormRider 2 is sized so a strip a little over two metres wide stores 100 mm of rain from a 10 m wide street.

Sources: KNMI, Waternet (Feb 2024), the BUCH water programme 2023 to 2026, and the Wavin Core and Q-Bic Plus datasheets.

What is already on the market

What is already on the market

I compared ten underground storage systems using their own datasheets. Stated strengths run from 28 t/m² to about 80 t/m², and AquaCell Plus-R is rated at 70.2 t/m², the same figure as the brief. Three of the ten say they nest for transport, and seven can be checked with a camera, some only in a special version.

I compared ten underground storage systems using their own datasheets. Stated strengths run from 28 t/m² to about 80 t/m², and AquaCell Plus-R is rated at 70.2 t/m², the same figure as the brief. Three of the ten say they nest for transport, and seven can be checked with a camera, some only in a special version.

Almost all of them are crates made for deep pits. Permavoid is the one built for our situation, a sub-base replacement 85 to 150 mm deep. The systems that name a material use polypropylene; the brief asks for recycled pipe-grade PE100.

Almost all of them are crates made for deep pits. Permavoid is the one built for our situation, a sub-base replacement 85 to 150 mm deep. The systems that name a material use polypropylene; the brief asks for recycled pipe-grade PE100.

System

Unit, mm

Void

Stated strength

Inspection

Nests

Wavin Q-Bic Plus

1200 × 600 × 600

95 to 96%

no kN/m² given

yes, 370 mm channel

not stated

Wavin AquaCell Eco

1000 × 500 × 400

95%

213 kN/m², no traffic

not stated

not stated

Wavin AquaCell Plus-R

1000 × 500 × 400

95%

70.2 t/m²

yes

not stated

Permavoid 85 and 150

708 × 354 × 85 or 150

92 to 95%

715 kN/m²

not stated

not stated

GRAF EcoBloc Inspect flex

800 × 800 × 320

95%

60 t vehicles, 800 mm cover

yes

yes

ACO StormBrixx

1200 × 600 × 914 or 610

95 to 97%

350 to 455 kN/m²

yes

yes

Atlantis Flo-Tank

685 × 408 × 450

95%

28 t/m²

not stated

not stated

REHAU RAUSIKKO Box 8.6

800 × 800 × 660

95%

420 to 800 kN/m²

SC and HC versions

yes

FRÄNKISCHE Rigofill inspect

800 × 800 × 660

95%

road class Bk3,2

yes

not stated

Polypipe Polystorm-R

1000 × 500 × 400

95%

610 kN/m²

with an access unit

not stated

StormRider 2

600 × 600 × 500

93%

not yet: yield at the leg edges under 218 kPa in the 3D model

yes, galleries

yes

Sources: the makers’ datasheets and tender texts, collected in November 2026. “Not stated” means the document does not say.

From brief to requirements

From brief to requirements

Each line of the brief became a number I can compute or a test I can run. The left column quotes the brief.

Each line of the brief became a number I can compute or a test I can run. The left column quotes the brief.

Brief

StormRider 2

How it is checked

Supports up to 70 t/m²

Not yet. Under the 218 kPa design load the 3D model reaches 32 MPa at the free edge of the legs, above the 25 MPa yield; the 687 kPa rating is out of reach in PE100 at this mass

3D FEA; full-scale load test

Handles rainfall of up to 110 mm/hour

466 litres per m² of footprint. A 2.1 m wide strip stores 100 mm from a 10 m wide street

Volume measured on the CAD model

Infiltration: water enters at 9 L/s

One d160 inlet takes 9 L/s at 0.53 m/s

Hand calculation

Max height of 50 cm per block

500 mm, with its base 0.63 m below the street

CAD

Adapted to the local groundwater level

The whole build-up ends 0.70 m down, at the BUCH high-groundwater line. On clay it stores and drains through a throttled outlet

Levels from the municipal street standard

Components remain fixed during use

Caps pin four deck corners with dowels; edge panels close the field, with a hook added in the review

CAD and drawings

Resists internal and external forces

A worker on the bare shell (12 MPa) and the pavement over 50 years (0.4 MPa) pass; traffic does not yet, and the legs need revision B

3D FEA

Prevents volume increase over time

The pavement alone deflects the shell 1 mm over 50 years with the creep modulus

3D FEA; creep test

Ensures effective road water runoff

Gullies feed the inlet panels; the fine comb and the geotextile keep sand out

Detail design

Each animal gets the job it is best at

Each animal gets the job it is best at

The product has to span, stack, stand on soft ground, store in cells and stay open for inspection. I looked at how five animals solve those problems and gave each one the part it suits best.

The product has to span, stack, stand on soft ground, store in cells and stay open for inspection. I looked at how five animals solve those problems and gave each one the part it suits best.

Sketch: turtle shell studies leading to the carapace dome, with the scutes as ribs and a parabolic profile

Turtle shell, the carapace

A dome carries load in compression. The shell follows a parabola, the shape a uniform load asks for, so a 5 mm skin with the scute lines turned into ribs underneath is enough to span 600 mm.

Sketch: a tortoise and the carapace with hollow posts that open underneath, so the shells nest at 62 mm

Pyramided tortoise, the hollow posts

Some tortoises grow each scute as a small pyramid. Hollow posts on the scute centres carry the deck and open underneath, so one shell drops into the next and they nest at 62 mm.

Sketch: an elephant foot spreading its load, leading to the ribbed foot pad under a column

Elephant foot, the foot pad

A wide ribbed pad spreads half a wheel, about 37 kN, to roughly 150 kPa on the ground. Holes between the ribs let the water through to the soil.

Sketch: honeycomb cells leading to the deck plate with two cell sizes and a fine comb on top

Honeycomb, the deck

Two cell sizes in one 40 mm plate. The 80 mm cells carry the wheel load to the posts, and a 27 mm comb in the top 10 mm holds the bedding grit.

Sketch: the tunnels of an ant nest leading to the inspection galleries under the shells, with a camera crawler

Ant nest, the galleries

An ant nest is as much tunnel as wall. The space under the shells forms arched galleries in both directions, for water and for a camera crawler.

Sketch: exploded view of one bay

Together, one kit

The five animals add up to six parts: carapace, deck, foot, column, cap and edge panel.

AI-generated sketches.

Four iterations to a kit that nests

Four iterations to a kit that nests

Each iteration is a parametric model, so mass, void and nesting are measured from the geometry. Every step fixed the worst number of the one before.

Each iteration is a parametric model, so mass, void and nesting are measured from the geometry. Every step fixed the worst number of the one before.

Iteration A: one-piece groin vault with columns

Vault

One moulded groin vault with its own columns. Strong, but it only nests at 318 mm, so trucks would carry mostly air.

Iteration B: thin dome on mushroom capitals

Capital

Pipe columns with mushroom capitals under a thin dome. The pipes worked; the capitals became the heaviest part and did not nest.

Iteration C: carapace with a deep honeycomb deck

Carapace

The dome flows down into funnel legs around the columns, and the capitals disappear. The deep honeycomb deck above it cannot nest.

Iteration D: carapace with hollow posts and a flat deck

Pyramided carapace

Hollow posts move the deck’s depth into the shell. The posts nest, and the deck becomes a flat 40 mm plate.

Measured on the model

Vault

Capital

Carapace

Pyramided carapace

Mass per bay

18.7 kg

21.6 kg

13.1 kg

11.7 kg

Share of the volume that holds water

89.2%

87.4%

92.5%

93.3%

Worst part for nesting

vault, 318 mm

capital, 306 mm

deck, 170 mm

shell, 62 mm

Storage per truckload

78 m³

110 m³

115 m³

206 m³

Why nesting decides the design

Why nesting decides the design

A trailer is full long before it is heavy. With the deep deck, iteration C fills a trailer with 115 m³ of storage. Once the posts nest, the shells stack at 62 mm and the same trailer carries 206 m³. That is the reason for the hollow posts: they move the deck’s depth into a part that already nests.

Five parts on a 600 mm grid

Five parts on a 600 mm grid

Every bay takes one carapace and one deck. Every grid point takes a foot, a column and a cap, and panels close the edges of the field. The column is cut from standard d160 SDR11 pipe, so it needs no mould of its own.

Every bay takes one carapace and one deck. Every grid point takes a foot, a column and a cap, and panels close the edges of the field. The column is cut from standard d160 SDR11 pipe, so it needs no mould of its own.

A field of six StormRider 2 bays: decks on the left, one deck lifted, carapaces with hollow posts on the right
Exploded view of one bay: foot, column, carapace, cap, deck and edge panel

Part

One per

Mass

Made by

Ships

Carapace

bay

4.38 kg

injection moulded

nests at 62 mm

Deck

bay

3.10 kg

injection moulded

stacks at 40 mm

Foot

grid point

1.00 kg

injection moulded

nests at 46 mm

Column

grid point

2.84 kg

cut from d160 SDR11 pipe

bundled

Cap

grid point

0.34 kg

injection moulded

nests at 50 mm

Edge panel

field edge

0.60 kg

injection moulded

stacks at 26 mm

A bay stores 168 litres for 11.7 kg of plastic, about 70 kg per m³ of water.

The six StormRider 2 parts laid out side by side

The carapace

The carapace

A paraboloid shell, z = 446 - 0.0015 r², with a 5 mm skin at the crown and 6 mm at the edge. Ribs 4 mm thick and 32 mm deep follow the scute lines underneath, and 23 hollow hexagonal posts with 6° of draft rise from the scute centres to carry the deck.

How the load travels

How the load travels

The design case is an 11.5 t driven axle with a 1.3 impact factor. Spread through the pavers and bedding, one wheel puts 218 kPa on the deck. The brief rates the system at 70 t/m², 687 kPa, about three times that.

The design case is an 11.5 t driven axle with a 1.3 impact factor. Spread through the pavers and bedding, one wheel puts 218 kPa on the deck. The brief rates the system at 70 t/m², 687 kPa, about three times that.

These are first estimates from hand calculations and a 2D section. The 3D model below tests them, and it changes the answer at the legs.

These are first estimates from hand calculations and a 2D section. The 3D model below tests them, and it changes the answer at the legs.

Load path from a wheel through deck, posts and shell to the ground
FEA of a semicircular and a parabolic arch under the same load

Why the shell is a parabola

Why the shell is a parabola

Same span, rise, wall and load in a 2D section. The semicircle bends past yield; the parabola stays in compression at 13 MPa, within 4% of the hand calculation. That set the shell’s shape, z = 446 - 0.0015 r². A 2D section cannot show what happens at the open legs, which is what the 3D model is for.

Stress analysis

Stress analysis

A 3D finite-element model of the carapace in quadratic tetrahedra, 0.9 to 1.4 million degrees of freedom, PE100 at its short-term modulus. Two support cases: the shell on its own with all the deck load on its posts, and the shell in the street, where the posts and caps share the deck load and the neighbouring shells hold its edges.

A 3D finite-element model of the carapace in quadratic tetrahedra, 0.9 to 1.4 million degrees of freedom, PE100 at its short-term modulus. Two support cases: the shell on its own with all the deck load on its posts, and the shell in the street, where the posts and caps share the deck load and the neighbouring shells hold its edges.

3D stress plot of the carapace under the design traffic load in the street: peak 32 MPa at the free edge where an arch meets a leg

In the street the design load puts 32 MPa on the free edge where an arch meets a leg, 1.3 times the 25 MPa yield, while the middle of the shell sits at 9 MPa. Membrane theory, which the hand calculation used, has no free edges, so it could not see this. On its own, with the bay edges free, the shell is worse: 70 MPa at the post bases.

In the street the design load puts 32 MPa on the free edge where an arch meets a leg, 1.3 times the 25 MPa yield, while the middle of the shell sits at 9 MPa. Membrane theory, which the hand calculation used, has no free edges, so it could not see this. On its own, with the bay edges free, the shell is worse: 70 MPa at the post bases.

Stress on the underside of the carapace: scute ribs and hollow post bases
First buckling mode in the street: the gallery arches buckle at the haunches over the legs

On its own the shell buckles at 0.41 times the design load, 88 kPa on the deck. In the street, held by its neighbours, it buckles at 0.89 times, 194 kPa, at the haunches of the gallery arches over the legs, and moulding imperfections bring that down to 58 to 97 kPa. The hand estimate of 405 to 674 kPa assumed a closed dome; the open legs and arches go first.

On its own the shell buckles at 0.41 times the design load, 88 kPa on the deck. In the street, held by its neighbours, it buckles at 0.89 times, 194 kPa, at the haunches of the gallery arches over the legs, and moulding imperfections bring that down to 58 to 97 kPa. The hand estimate of 405 to 674 kPa assumed a closed dome; the open legs and arches go first.

Bar charts of peak stress per load case against yield and of buckling pressure against the design and rating loads
Bar charts of peak stress per load case against yield and of buckling pressure against the design and rating loads
3D stress plot of revision B with 10 mm legs and deeper lips: peak 26 MPa at a post base

Revision B

Revision B

Legs and outer shell at 10 mm instead of 6, lips 56 mm deep instead of 36. The peak drops to 26 MPa, at the yield, and moves to a post base, where a moulded fillet will lower it further. It costs 1.3 kg per shell.

At yield is not a design. The next step is to close the free edges of the legs with a return flange, so they stop acting as cantilevers.

Plan view stress maps of the deck plate as drawn and with edge beams between the caps
Plan view stress maps of the deck plate as drawn and with edge beams between the caps

The deck needs edge beams

The deck needs edge beams

A plate model of the honeycomb deck shows 40 MPa in the walls next to the posts, where the hand calculation found 7.9 MPa, because the deck overhangs the last posts. Carried cap to cap along its two free edges it drops to 11 MPa.

Mesh check: from 8 to 6 mm elements the 99.5th percentile stress changes 0.1% and the displacement 0.6%; only the sharp, unfilleted post-to-shell corners keep rising, as corners do. Linear elastic, perfect geometry, legs pinned on the foot pads; these results rank risks and size parts, they replace no test.

Designed to be moulded

Designed to be moulded

Before anything goes to a toolmaker, every moulded part was checked against its mould opening direction, wall thickness and flow length. The carapace is the big one: 0.34 m² of projected area needs about 1,030 t of clamp force at 30 MPa cavity pressure, and its melt has to travel 628 mm from a crown gate to the end of a leg, so the tool needs several valve gates.

Before anything goes to a toolmaker, every moulded part was checked against its mould opening direction, wall thickness and flow length. The carapace is the big one: 0.34 m² of projected area needs about 1,030 t of clamp force at 30 MPa cavity pressure, and its melt has to travel 628 mm from a crown gate to the end of a leg, so the tool needs several valve gates.

Draft analysis of the carapace top: posts and dome release, scute grooves and side lips at zero draft
Draft analysis of the carapace underside: ribs and lips at zero draft
Draft analysis of the deck: cell walls at zero draft and undercut landing cells

Part

Projected area

Clamp force

Thickest wall

Cooling, nominal and thickest

Tool

Carapace

0.34 m²

1,030 t

6.9 mm

36 s, 48 s

two-plate, one cavity, valve gates

Deck

0.17 m²

521 t

10.2 mm

20 s, 105 s

two-plate, one cavity, no slides

Foot

0.12 m²

361 t

8.7 mm

36 s, 76 s

two-plate, two cavities

Cap

0.04 m²

118 t

14.8 mm

36 s, 221 s

two-plate, four cavities

Edge panel

0.09 m²

275 t

6.8 mm

36 s, 47 s

two-plate, two cavities

Column

none

none

14.6 mm pipe wall

none

cut, squared and deburred from d160 SDR11 pipe

Clamp force at a mean cavity pressure of 30 MPa (20 to 40 MPa gives the range). Cooling time from the plate formula for HDPE with a thermal diffusivity of 0.10 mm²/s, melt at 230 °C, mould at 30 °C and ejection at 90 °C. Walls measured on the model to about 0.5 mm.

Design review before tooling

Design review before tooling

Cutting exact sections through the model for the drawings turned up eight issues. None of them changes the concept, and each has a fix in the next revision of the model.

Cutting exact sections through the model for the drawings turned up eight issues. None of them changes the concept, and each has a fix in the next revision of the model.

Finding

Fix

Carapace legs sit 4.9 cm³ into the foot ribs, and the Ø172 leg hole meets a Ø174 socket

Open the hole to Ø180 and add a landing ring on the foot: about 2.4 MPa bearing per leg

The column stops 4 mm under the cap, so the cap carries nothing

Cut the column to 448 mm with square ends

Deck and carapace are both 600 mm on a 600 mm grid, so moulding tolerance has nowhere to go

Mould both to 595 ±1 mm, for a 4 to 6 mm joint

The edge panel has no stop on its inner face, and earth pressure pushes it inward

Add a hook that catches under the carapace lip

In the 23 landing cells the deck floor and the fine comb close the cell from both sides: 835 cm² no mould half can reach

Leave the fine comb out above the landing floors

20% of the carapace surface is drawn at 0°, and its ribs are 67 to 80% of the skin, so sink marks are likely

1° per side, ribs 3.5 mm at the root, then recheck buckling

Solid Ø16 cap dowels and solid boss tops on the deck: 221 s and 105 s to cool

Core them out to the wall thickness of the part

The strength values come from a PE100 pipe compound, an extrusion grade

Choose an injection-moulding HDPE grade and recheck strength and creep against its datasheet

Fits and interfaces: node top, node base, perimeter panel and bay joint, with the specification table

Drawings

Drawings

Part drawings cut from the model: exact sections, dimensions in millimetres. Click any drawing to see it full size.

Part drawings cut from the model: exact sections, dimensions in millimetres. Click any drawing to see it full size.

Exploded isometric line drawing of one bay with its parts list
Part drawing of the carapace: plan and diagonal section
Part drawing of the deck: plan, fine comb detail and section through the dowel bosses
Part drawings of the foot pad and the cap: plans and sections
Close-up of a cap locking the corners of three decks above the carapace posts
Section drawing of the node: foot, column, cap and deck corners

How it sits in the street

How it sits in the street

Pavers and bedding go straight on top, on a geotextile. The whole build-up ends 0.70 m below the street, at the BUCH high-groundwater line, with the base of the field 0.63 m down.

Pavers and bedding go straight on top, on a geotextile. The whole build-up ends 0.70 m below the street, at the BUCH high-groundwater line, with the base of the field 0.63 m down.

General arrangement section through the bay centres with the street build-up
Plan of two by two bays with decks on and off

On the sandy beach ridge under Heiloo and Castricum, a full field drains in about a day. On clay it would take about a week, so there it needs an outlet.

On the sandy beach ridge under Heiloo and Castricum, a full field drains in about a day. On clay it would take about a week, so there it needs an outlet.

It cannot float. Water fills it, so only the plastic itself displaces water: a net 0.5 kg of lift per bay against 97 kg of pavement on top.

It cannot float. Water fills it, so only the plastic itself displaces water: a net 0.5 kg of lift per bay against 97 kg of pavement on top.

Bar chart of hours to empty a full field by soil type
Bar chart of hours to empty a full field by soil type

How it is built and shipped

How it is built and shipped

Every part can be carried by one person; the heaviest, the shell, weighs 4.4 kg. Two people build a field in five steps, without a crane.

Every part can be carried by one person; the heaviest, the shell, weighs 4.4 kg. Two people build a field in five steps, without a crane.

Storyboard sketch of the installation: trench, foot pads, columns, carapaces, decks, geotextile and pavers

AI-generated storyboard sketch.

Build step 1: levelling bed and foot pads

Levelling bed and feet on a string line

Build step 2: pipe columns in the feet

Columns cut from pipe drop into the sockets

Build step 3: carapaces and edge panels

Shells slide over the columns and panels close the edges

Build step 4: caps and decks

Caps lock the decks

Build step 5: geotextile, bedding and pavers

Geotextile, bedding and pavers go back on

Nested carapaces, stacked decks, feet and pipe columns on pallets

A trailer carries about 206 m³ of storage: nearly twice iteration C, and about three times a crate that ships assembled. ACO’s StormBrixx, at 347 m³ by its maker’s figure, still ships more, and the shells and pipe columns are where StormRider 2 could gain.

A trailer carries about 206 m³ of storage: nearly twice iteration C, and about three times a crate that ships assembled. ACO’s StormBrixx, at 347 m³ by its maker’s figure, still ships more, and the shells and pipe columns are where StormRider 2 could gain.

Bar chart of storage volume shipped per truck
Bar chart of storage volume shipped per truck

Every bay can be inspected

Every bay can be inspected

The galleries are 275 mm high at the crown and about 300 mm wide at half height. That is smaller than the 370 mm channel in Q-Bic Plus, but enough for a small crawler camera, and the open column bores let the air out as the water comes in.

The galleries are 275 mm high at the crown and about 300 mm wide at half height. That is smaller than the 370 mm channel in Q-Bic Plus, but enough for a small crawler camera, and the open column bores let the air out as the water comes in.

View along an inspection gallery under a row of carapaces

Test plan

Test plan

The models and the numbers make the case. These physical tests would decide it, in this order, starting with the risk that sets the margin.

The models and the numbers make the case. These physical tests would decide it, in this order, starting with the risk that sets the margin.

Test

What it answers

Passes when

Full-scale load on a 2 × 2 field of revision B

Where does it yield and buckle, and does the 3D model predict it?

Strains at the leg edges and post bases within 15% of the model; no buckling below 1.5 times the design load

1000-hour sustained load

Does it creep under the pavement?

Crown deflection settles below 2 mm

Mould trial of the carapace

Can the ribs under a 5 mm skin be moulded clean?

No sink marks; otherwise the ribs go to 3.5 mm at the root

Fatigue of recycled PE100

Recycled pipe HDPE fails sooner near yield

No cracks after a million axle cycles at service stress

Inflow and sediment

Does 9 L/s get in, and does sand stay out?

The inlet passes 9 L/s and the galleries stay clean for a season

Camera run

Can a crawler reach every bay?

Full coverage of a 6 × 4 field

Installation trial

How fast can two people build it?

Time per m² compared with a stone foundation

Outcome

Outcome

StormRider 2 stores 466 litres under every square metre of street in the half metre above high groundwater, 2.7 to 4.7 times what a stone foundation holds in the same depth, with 95 to 97% less stone. Every part nests or stacks, so a trailer carries 206 m³ of storage, and a camera can reach every bay.

StormRider 2 stores 466 litres under every square metre of street in the half metre above high groundwater, 2.7 to 4.7 times what a stone foundation holds in the same depth, with 95 to 97% less stone. Every part nests or stacks, so a trailer carries 206 m³ of storage, and a camera can reach every bay.

The structure is not finished. The hand calculations said the shell works in compression; the 3D analysis showed that its open legs bend at their free edges and buckle there first. Thicker legs, deeper lips and edge beams in the deck bring the design load to yield, and the next revision has to close the leg edges before a prototype is worth moulding.

The structure is not finished. The hand calculations said the shell works in compression; the 3D analysis showed that its open legs bend at their free edges and buckle there first. Thicker legs, deeper lips and edge beams in the deck bring the design load to yield, and the next revision has to close the leg edges before a prototype is worth moulding.

466 L/m²

466 L/m²

stored in 500 mm of depth

2.7 to 4.7×

2.7 to 4.7×

the water a stone foundation holds

95 to 97%

95 to 97%

less stone in the street

206 m³

206 m³

of storage per truckload

The same street after reconstruction, wet but draining

AI-generated image of the same street after reconstruction. The storage sits out of sight under the pavers.

What I would do next

What I would do next

Close the free edges of the legs with a return flange, fillet every post base, and rerun the 3D model until the design load sits below two thirds of yield. Then mould one shell and load a 2 × 2 field until it buckles, with strain gauges on the leg edges, where the model puts the peak.

Close the free edges of the legs with a return flange, fillet every post base, and rerun the 3D model until the design load sits below two thirds of yield. Then mould one shell and load a 2 × 2 field until it buckles, with strain gauges on the leg edges, where the model puts the peak.

Get in touch

Beck Prat, Medior Product Design Engineer, is open to UX, Product, and Engineering roles.

Get in touch

View CV

LOCATION

The Hague, NL

STATUS

Available now

ELIGIBILITY

Work eligible in NL, EU, EAEU

Quick recruiter summary

Selected work

PackBack, Philips, JDE Peet’s, Sonion, Stichting Stunt

Focus

Digital tools, physical products, brand systems

Collaboration

Product, engineering, stakeholders

Get in touch

Beck Prat, Medior Product Design Engineer, is open to UX, Product, and Engineering roles.

Contact

View CV

LOCATION

The Hague, NL

STATUS

Available now

ELIGIBILITY

Work eligible in NL, EU, EAEU

Quick recruiter summary

Selected work

PackBack, Philips, JDE Peet’s, Sonion, Stichting Stunt

Focus

Digital tools, physical products, brand systems

Collaboration

Product, engineering, stakeholders